Deprecated: Unparenthesized `a ? b : c ? d : e` is deprecated. Use either `(a ? b : c) ? d : e` or `a ? b : (c ? d : e)` in /usr/www/users/menaruafud/wp-content/plugins/revslider/includes/output.class.php on line 1912 FIRST COAL PRODUCTION DUE IN 2020 – Menar

The project, comprising a coal deposit of 307.86-million tons, is located between Vereeniging and Meyerton in Gauteng, within the Vereeniging-Sasolburg coalfield

Recommend
Share
Tagged in
Leave a reply